Botswana Training Workshop June 2024
  • Tutorial 3: Planning for water resilience in Botswana.
    • Introduction
    • Botswana National Water Resource System Model (Training version)
    • Baseline system performance
    • Activating the Chobe-Zambezi Transfer
    • Implementing the Walvis Bay transfer
    • Implementing the Lesotho Highlands Transfer
    • Reducing Non-Revenue Water
      • Calculating domestic demand within the model
      • Implementing a NRW demand loss reduction
    • Implementing the Chobe and NRW losses reduction
    • Additional exercises
  • Tutorial 4: Adding new infrastructure in the Botswana national model
    • Adding Mosetse dam
    • Adding a demand
    • Adding a water treatment works with losses
    • Adding a source representing groundwater
    • Additional Exercises
  • Tutorial 5: More advanced modelling
    • Background on Evaporation and Precipitation on Reservoirs
    • Adding reservoir bathymetry (Area)
    • Adding reservoir bathymetry (Level)
    • Adding monthly evaporation and rainfall
  • Tutorial 6: Allocation penalties
    • Exercise 1a Two nodes
    • Exercise 1b Two demands
    • Exercise 1d Minimum Flow Properties
    • Exercise 2a Simple system with reservoir draw downs
    • Exercise 2b Simple system with overflow
  • Tutorial 7: Additional exercises with allocation penalties and control curves
    • Additional exercises using allocation penalties and control rules
    • Exercise to implement demand reductions when reservoirs levels are low
Powered by GitBook
On this page

Tutorial 5: More advanced modelling

Background on Evaporation and Precipitation on ReservoirsAdding reservoir bathymetry (Area)Adding reservoir bathymetry (Level)Adding monthly evaporation and rainfall
PreviousAdditional ExercisesNextBackground on Evaporation and Precipitation on Reservoirs