Exercise 2a Simple system with reservoir draw downs
Last updated
Last updated
Note: Create a new network called Exercise 2a and setup the timestep before running the network as described in Exercise 1a.
Navigate to the left panel and click on Build to open the Nodes list.
Drag and drop to the workspace Map:
A new window will pop-up, click on Submit
Visualize the simulated_flow results
Visualize the simulated_volume results
This network includes a storage node that simulates a reservoir. The objective of this reservoir is to store water. Initially, it starts with a volume of 200 Mm³, and its volume will increase or decrease based on the balance between intake and outtake.
The output1 node attempts to consume 12 Mm³/day from the reservoir, if available. Meanwhile, the catchment1 node contributes 10 Mm³/day to the reservoir. This means that the reservoir is expected to decrease in volume over time, as it will provide more water than it receives.
The results demonstrate that the reservoir's volume decreases until it is empty on Apr 9 2024, indicating that it will no longer be able to meet the supply requirements of output 1. At that point, output 1 will only receive the amount supplied by the catchment node 10 Mm³/day.
Since output 2 does not have an associated penalty, no water is allocated to this node.
Select output_1 node and change Max Flow to 20 Mm³/day
A new window will pop-up, click on Submit
The system conditions changed when the demand from the output 1 node increased from 12 Mm³/day to 20 Mm³/day. This change causes the reservoir to empty more quickly. Previously, the reservoir would be empty by Apr 9, 2024, but with the increased demand, it is now projected to be empty earlier, by January 20, 2024.
Once the reservoir is empty, the output 1 node will only receive 10 Mm³/day, which is the flow provided by the catchment node.
Select the storage node and change the allocation penalty to -20
As we have changed the allocation penalty for the storage node to be the most negative in the system, it now has the highest priority. This means the system will prioritize allocating water to this node.
The storage node starts filling up from the initial 200 Mm³ as per initial conditions until it reaches its maximum capacity of 365 Mm³. Once this maximum volume is reached, any excess water will be released. This capacity is reached by January 16, 2024.
Output 1 is the next priority node in the system. After the storage node is full, the system will begin allocating the excess water to output 1. This excess water is the 10 Mm³/day supplied by the catchment node.
- 1 catchment node
- 2 output nodes
- 1 storage node
Click on edge to activate “link mode”, connect the nodes and fill their attributes as shown in the picture below:
Click again on edge to deactivate “link mode”.
On the left panel click on Run a Model .
On the left panel click on Run a Model .