Botswana National Water Resource System Model (Training version)

The Botswana National Water Resource System Model (Training version) can be seen below.

The model includes the Gabronone, Bokaa, and Dikgatlong dams and a simplified version of the NSC system as well as the major population centres of Gaborone and Mochudi.

The training model is run over a 30-year time horizon representing possible conditions in the year 2060. Flow units are in Mm3/day while storage volumes are in Mm3.

Analysts are able to choose which combinations of future uncertain conditions defined in the table above to run and which of the future possible interventions to activate for analysis.

Last updated